Power transformers
Rated power
Voltage class
We supply transformers to grid operators, power plants and industrial enterprises strictly within the agreed deadlines. We are responsible for every transformer, each of which is designed individually to the technical requirements and site conditions of each Customer.
EVERY MONTH OF WAITING FOR A TRANSFORMER COSTS YOU MONEY.
A SHORT DELIVERY TIME EARNS YOU EXTRA PROFIT.
TRAFOSYNC transformers: delivery in up to 9 months. Quality supervision by TÜV Rheinland available upon the Customer’s request.
Savings calculator →



Materials used
- Cores made of grain-oriented electrical steel.
- Winding wire made of electrolytic copper with high-temperature insulation.
- Thermally stabilized insulation paper with a high degree of polymerization after the coil-drying processes.
- Inhibited transformer oil per IEC 60296: Nynas Nytro 10XN.
Applications
- Transmission and distribution system operators
- Power plants
- Wind and solar power plants
- Data centers
- Battery energy storage systems (BESS)
- Industrial facilities
- Railway traction transformers and other special-purpose industrial transformers.




Quality control and factory tests
High quality is TRAFOSYNC’s main requirement for the transformers it supplies. Every transformer is manufactured strictly to the parameters specified by the Customer. Quality is controlled at every stage, from components to final tests, thus ensuring reliable operation of the transformer for decades. At the Customer’s request, factory tests are carried out under the supervision of TÜV Rheinland.
- Factory acceptance test (FAT) of every transformer
- Type tests, insulation tests and short-circuit withstand tests
- Partial discharge measurement and leak testing



